Friday, September 09, 2011

Framing Started (slowly)

I moved a boat load of lumber today, about 116 2x4's, and so framing started a little slowly.  I also was forced to make some frustrating decisions that sent me back to Home Despot twice.  The first is that all the 80" doors are two tall, and the second is that I need to replace the insulation to preserve space and make it easier to work.

You can see here in the attached image how the existing insulation has the door frame askew, so tomorrow it has to come out, and then get the pink insulation ripped out.  So gloves, masks and long sleeves.  I hate working with insulation, but it is the right thing to do.


No comments: