Feb 18
On the 18th they pretty much finished the framing on the main floor. Bryan was enthused to see the a fork lift put up the steel beam in the garage.
Feb 19:
On the 19th they put up the second floor, and poured the front step, Erin got a flat tire.
No comments:
Post a Comment